I thought I would post some pictures, of the work I have been doing here in Rialto. This is going to be quite a show case when they are done. The sheetrock will be finished this week, along with the new expanded parking lot. The new building will seat 900.
There are 5 colors on the outside.... the paint is an elastomeric coating, very rubbery, very thick.
This is the front of the new building, To help you understand the scale, these wall are 30' tall. You can look into the building and see the barrel ceiling in the entry....
Here is the inside ceiling, looking into the building through the front door. There will be a custom mural, and lots of faux painting in this room.
If you have ever heard Bro Booker preach, you know this is his favorite painting.... It is going up on the wall in the center of the barrel....16'x20' the sky on the barrel will match the sky in the painting.
This is looking into the church from the sound booth, this will eventually become the gym. The ceilings are exposed, I already painted them, using 135 gallons of black paint. once the Sheetrock is finished the black will come down the wall 8 feet, to a crown. The platform will go between the two doors you can see.
Still working on colors for the inside, waiting for final selection of the tile and carpets....
This is a close of the ceiling, quite alot of work went into prep before painting started. All the sprinkler heads, smoke detectors and lights had to be masked off.
I hope you have enjoyed seeing what the Lord is doing in Rialto. The Bookers are a wonderful, kind family. It is reflected in the lives and the dedication of their people. I am so honored that they asked us to come and be a part of what God is accomplishing here. To even be considered is a very high honor. We have met so many new friends and had so many new doors open for our ministry...